Photos
|
| Date
| Subject
| Photographer
|
General Photos on ATLAS and its Magnet System
|
|
|
|
2008
|
| 05-Nov-2008
| Solenoid Level Control Heater (spare)
|
|
| 22-Aug-2008
| Solenoid and Toroids Running Together
|
|
| 21-Aug-2008
| Control Dewar, Bus-bars and Control Room
|
|
| Jun-2008
| Bus-bar connection and Modification Current Lead Cooling Line
|
|
| 04-Jun-2008
| Maintenance cryogenic system
|
|
| 16-May-2008
| Replacement Bus-bar Connections and Cold Gas Return Lines
|
|
|
|
|
2007
|
| 24-Sep-2007
| Bus-bar Segment 29 & 30
|
|
|
|
|
2006
|
| 04-Aug-2006
| End of Commissioning Party
|
|
| Aug-2006
| Commissioning & Field Mapping
|
|
| 01-Aug-2006
| Reached full field (2 T)
| Masanori Kawai
|
| Jul-2006
| Field Mapping Machine
|
|
| 10-Jul-2006
| Repair Quench Line
|
|
| Mar-2006
| Flexible lines
| Jos Metselaar
|
| 13-Mar-2006
| Transferline
| Jos Metselaar
|
| 07-Mar-2006
| Cutting thermal/vacuum barriers of the transferline
| Jos Metselaar
|
| 06-Mar-2006
| Positioning flexible transferline (cold gas)
| Jos Metselaar
|
| 27-Feb-2006
| Positioning of the transferline
| Jos Metselaar
|
| 22-Feb-2006
| Lowering the transferline into UX15
| Jos Metselaar
|
| Feb-2006
| Final Closing Vacuum Bellows
|
|
| Jan-2006
| Finishing Chimney to Control Dewar Connection
|
|
|
|
|
2005
|
| 14-Dec-2005
| Control Dewar Installation
|
|
| Dec-2005
| Chimney to Control Dewar Connection
|
|
| Nov/Dec-2005
| Chimney to Coil/Bulkhead Connection
|
|
| 25-Nov-2005
| Preparation of Chimney to Coil Connection
|
|
| 08-Nov-2005
| View of the Barrel Toroid after insertion of the Barrel Cryostat
| CERN Photo Archive
|
| 08-Nov-2005
| View of the Calorimeter in final position
| CERN Photo Archive
|
| 04-Nov-2005
| The installation team after movement completed
| CERN Photo Archive
|
| 04-Nov-2005
| Solenoid and Barrel in Place
|
|
| 04-Nov-2005
| Barrel Calorimeter Movement to Z=0
| C. Marcelloni Oliveira
|
| 04-Nov-2005
| View of the Barrel Toroid Completed
| CERN Photo Archive
|
| 03-Nov-2005
| View of the Calorimeter from the Barrel Toroid
| CERN Photo Archive
|
| 03-Nov-2005
| View of the Calorimeter before moving
| CERN Photo Archive
|
| 02-Nov-2005
| Repositioning of the Chimney
|
|
| 18-Oct-2005
| Setting of the Chimney inside the Barrel Toroid
|
|
| 18-Oct-2005
| Chimney Installation
| J. Metselaar
|
| Mar-2005
| Cold Test Transfer Lines
| J. Metselaar
|
| Feb-2005
| Piping Valve Unit
| J. Metselaar
|
| 27-Jan-2005
| Valve Unit Arrival in Point 1 and Lowering to USA15
| J. Metselaar
|
| 20-Jan-2005
| Vacuum Piping in UX15 and Control Dewar in Hall 180
| J. Metselaar
|
| 20-Jan-2005
| Removal of PCS from the Bunker
|
|
| 05-Jan-2005
| Survey of Tile Calorimeter and Barrel Cryostat
| A. Behrens
|
|
|
|
2004
|
| 10-Dec-2004
| Barrel Cryostat and Tile Calorimeter
| CERN Photo Archive
|
| 28-Oct-2004
| Descent of the Cryostat from SX1 into UX15
| C. Fabre
|
| 28-Oct-2004
| Descent of the Cryostat into UX15
| CERN Photo Archive
|
| 28-Oct-2004
| Descent of the Cryostat from SX1
| CERN Photo Archive
|
| 28-Oct-2004
| Barrel Cryostat Before the Descent
| CERN Photo Archive
|
| 27-Oct-2004
| Transport Cryostat from Bat.180 to Point 1
| C. Fabre
|
| 27-Oct-2004
| Transport Cryostat from Bat.180 to Point 1
| CERN Photo Archive
|
| 16-Oct-2004
| CERN Open Day
| CERN Photo Archive
|
| Jul-2004
| On-surface Test
|
|
| Jun-2004
| Cooldown
|
|
| 11-Jun-2004
| Barrel Cryostat
| C. Fabre
|
| Mar-2004
| Bulkhead Assembly and Cryostat Closure
|
|
| Feb-2004
| Installation in the Barrel Cryostat
|
|
| Feb-2004
| Insertion Coil into Barrel Calorimeter
|
|
| 26-Feb-2004
| Insertion into the Barrel Cryostat (Video)
| Yasuhiro Makida
|
| 26-Feb-2004
| Insertion into the Barrel Cryostat
| Akira Yamaguchi
|
| 6-Feb-2004
| Insertion into the Barrel Cryostat (Test)
| CERN Photo Archive
|
| 16-Jan-2004
| Setting on the cryostat insertion beam
|
|
| 16-Jan-2004
| Setting on the cryostat insertion beam
| CERN Photo Archive
|
| 16-Jan-2004
| Alignment for the cryostat insertion beam
| CERN Photo Archive
|
| 16-Jan- 2004
| Preparation for lifting
| CERN Photo Archive
|
| 16-Jan-2004
| ATLAS Solenoid
| CERN Photo Archive
|
|
|
|
2003
|
| 13-Oct-2003
| Alignment Survey
|
|
| 29-Aug-2003
| Transport into clean room
|
|
| 25-Aug-2003
| Transport from Bldg.609 to Bldg.180
|
|
| Jun-2003
| Extension chimney installation
|
|
|
|
|
2002
|
| Jun-2002
| Proximity cryogenics and chimney test
|
|
| 24-Jun-2002
| Barrel Cryostat in Bat. 180
| CERN Photo Archive
|
| 2002
| Barrel Cryostat in Bat.180
| LAr group
|
| 25-May-2002
| Chimney to Control Dewar Connection
|
|
|
|
|
2001
|
| 13-Nov-2001
| Transport from Bldg.180 to Bldg609
|
|
| 1-Oct-2001
| Barrel cryostat installation model
|
|
| 1-Oct-2001
| Acceptance test at CERN (2)
|
|
| 28-Sep-2001
| Official reception at CERN
| KEK
|
| 28-Sep-2001
| Official reception at CERN
| CERN Photo Archive
|
| 27-Sep-2001
| Acceptance test at CERN (1)
|
|
| 7-Sep-2001
| Unpacking proximity cryogenics
|
|
| 3-Sep-2001
| Arrival of the ATLAS Solenoid from Japan
| CERN Photo Archive
|
| 10-Jul-2001
| Barrel Cryostat in Bat.180
|
|
| 25-Jul-2001
| Transportation from Japan to CERN
|
|
|
|
|
2000
|
| 26-Dec-2000
| Factory Test
|
|
| 3-Dec-2000
| Factory Test
| Photo Shima
|
| 21-Jun-2000
| Barrel Cryostat
| CERN Photo Archive
|
| 25-May-2000
| Factory Proximity Cryogenics Test
| Photo Shima
|
|
|
|
1999
|
| 21-Jun-1999
| Construction and Test of the Barrel Cryostat
| CERN Photo Archive
|
| 1999
| Coil on Inner Warm Vessel
| Photo Shima
|
| 1999
| Coil
| Photo Shima
|
| 1999
| Inner Warm Vessel
| Photo Shima
|
|
| Conductor
| S. Mizumaki
|